Executive Cockpit
Verified takeoff for your house in Lekki (185.5m²). Currently in Foundation phase.
Portfolio Liquidity
₦12.5M
Net Cash Available
Project Credits
8
Billed per Project
Active Pipelines
3
Ongoing Takeoffs
Net Billing
+3.8%
Overbilling Status
Onboarding Status
✅ Site manager linked to compliance log.
Budget Status
₦595,500 saved via AI Swap
Procurement Status
30% Paid • Awaiting Scan-to-Release
Calculated via verified 2026 supplier network
Value Engineering Impact
₦595,500
Strategic audit savings secured.
Excavation & Blinding
Reinforced Raft Foundation
Blockwork (Ground Floor)
Roofing & Finishing
Scheduling Warning
Timeline assumes standard 2026 Lekki soil curing cycles. Rain delays during the "Foundation Pour" phase may impact subsequent blockwork by +3 days.
Dangote Cement (42.5R High-Strength)
0 / 390 bags
12mm Fe 550D High-Strength Steel
0 / 148 lengths
| Timestamp | Event | Performed By | Verification |
|---|---|---|---|
2026-02-18 07:42 | Onboarding Sent | AI Agent | VERIFIED |
2026-02-18 09:15 | Price Lock Certificate Issued | Smart Trigger | SETTLED |
2026-02-18 11:20 | Courtesy SMS Sent to LASBCA | Regulatory Engine | VERIFIED |
Efficiency Savings Secured
₦595,500
Includes Steel yield optimization (Fe 550D) and High-Early-Strength Cement (42.5R).
Commitment Lock-in
Secures 2026 structural material prices and initiates regional delivery dispatch.
Settlement Amount
₦2,686,200
ID: LITH-PAY-2026-AF-001
Execution Balance
Held in regional escrow. Released instantly upon verified Site Manager waybill proof.
Due at Delivery
₦6,267,800
Regulatory Audit Trail
Final Reconciled Project Total
₦8,954,000
ISO 9001:2026 CERTIFIED PROCUREMEMT
Chain of Custody
Financial Ledger
Auditor Access
Early Material Reservation (RFQ)
Insurance Broker Sync
"The ₦595,500 saved through Value Engineering has been successfully moved to your Projected Capital Fund."
Materials for Project Lithos-2026 are currently in transit. Use this tool once the truck arrives.
Max Daily Headcount
Avg. Weekly Burn
| Trade Category | Team Size | Weekly Cost |
|---|---|---|
Masonry Team 85% Utilized | 6 | ₦140,000 |
Steel Fixers 95% Utilized | 4 | ₦112,000 |
General Laborers 100% Utilized | 8 | ₦120,000 |
Productivity Strategy
"By staggering the Steel Fixing and Masonry teams, we avoid site congestion at the raft perimeter, ensuring a 12% gain in hourly yield."